(0844) 411 3482

Monday - Friday 9.00 - 17.30

hello@ashbournesafetytraining.co.uk

working at heights


Harness training for experienced and novices

Course Objective

Training the candidates in Harness Training which meets the statutory requirements of the Health & Safety at Work Act 1974 and other relevant statutory provisions.

The aim of the course is to provide training and knowledge in the safe use of Harness in the work place.

Course Content
This course will provide the delegates with the information required of them to safely use items of personal fall protection equipment to protect against the potential fall from height.
The course will cover identification, selection and use of many different items of equipment that are available in the European marketplace.
The course will include the requirements to perform a pre-use safety inspection of the equipment, the faults and dangers that may be identified, which items of FPE are appropriate for various types of work tasks, how each item of FPE is to be used to create a safe fall protection system, and the dangers of falling.

Assessment: Theory and Practical Examination

Ratio 1- Instructor, Minimum 4 - Maximum 10 Candidates

Duration
The above course will vary on the duration depending on the experience or number of candidates ½ to 1 day course.


Tower Scaffold training for experienced operators and novices

Tower Scaffold designed to comply with the legislative needs of persons involved in construction and anyone working from lightweight access towers.

Course Objective
The course complies with the Working at Height Regulations and will enable operators to erect, use and dismantle lightweight access towers in a safe and secure manner.

Course Content
Safe operating from access towers
Safe working at height
Sequence of erection & dismantling
Repositioning erected towers
Recognition of components and their application
Provision of bracing, ties, kick boards and hand rails
Identification of safe ground conditions & environmental restrictions
Use of outriggers
Health & Safety At Work Act
PUWER Regulations

Assessment: Theory and Practical Examination

Ratio 1- Instructor, Minimum 4- Maximum 8 Candidates

Duration 1 day.


Ladder training for experienced operators and novices

Course Objective
The course complies with the Working at Height Regulations and will enable operators to erect, use and dismantle Ladders in a safe and secure manner.

Course Content
Working At Height Legislation and Regulations
Product Standards & Classifications
Hazards
Legislation, Guidance and Approve Code Of Practice (ACOP)
Pre-Use and Formal Inspections
Manufacturing Processes
Maintenance and Repairs
 Equipment Disposal

Assessment: Theory and Practical Examination

Ratio 1- Instructor, Minimum 4 - Maximum 10 Candidates

Duration
The above course will vary on the duration depending on the experience or number of candidates ½ to 1 day course.


Working at Heights training for experienced and novices

Course Objective
Training the candidates in Working at Heights which meets the statutory requirements of the Health & Safety at Work Act 1974 and other relevant statutory provisions. The aim of the course is to provide training and knowledge in the safe operation when working at heights.

Course Content
Legal Duties
Regulations
Responsibilities
PPE Requirements
Accident Causes & Prevention
Safe Working at Height
Risk Assessment
Safe Systems of Work.

Assessment: Theory and Practical Examination

Ratio 1- Instructor, Minimum 4 – Maximum 8 Candidates

Duration
The above course will vary on the duration depending on the experience or number of candidates ½ to 1 day course.


620 Memorial Drive in Cambridge was renovated from core structure for Hybridon, Inc., now Pfizer occupies the building. Interesting fact: During early construction, the basement was flooded to the extent that the only access to the water shut off valves in the basement was by boat.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.


620 Memorial Drive in Cambridge was renovated from core structure for Hybridon, Inc., now Pfizer occupies the building. Interesting fact: During early construction, the basement was flooded to the extent that the only access to the water shut off valves in the basement was by boat.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.


620 Memorial Drive in Cambridge was renovated from core structure for Hybridon, Inc., now Pfizer occupies the building. Interesting fact: During early construction, the basement was flooded to the extent that the only access to the water shut off valves in the basement was by boat.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.


620 Memorial Drive in Cambridge was renovated from core structure for Hybridon, Inc., now Pfizer occupies the building. Interesting fact: During early construction, the basement was flooded to the extent that the only access to the water shut off valves in the basement was by boat.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.


620 Memorial Drive in Cambridge was renovated from core structure for Hybridon, Inc., now Pfizer occupies the building. Interesting fact: During early construction, the basement was flooded to the extent that the only access to the water shut off valves in the basement was by boat.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat consequat auctor eu in elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Mauris in erat justo. Nullam ac urna eu felis dapibus condimentum sit amet a augue. Sed non neque elit. Sed ut imperdiet nisi. Proin condimentum fermentum nunc.

Oroin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris.

Proin condimentum fermentum nunc. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit tincidunt auctor a ornare odio.

AST have been delivering high quality and approved safety training for over 15 years

Get a Quote

Handcrafted By | C2 Business © 2016, All rights reserved.

Scroll to Top